In June 2017, Andrews Technologies, Inc. (ATI) successfully delivered equipment totaling approximately $9.9 million to PEMEX consisting of catwalks, PCR, Mud Pumps, Top Drive, Caterpillar Engines and a Hydraulic Power Unit. All of this equipment was delivered at El Castaño with the commitment of ATI and its partners to integrate the equipment to the rig and do a complete successful rig up later on during the year. Most of the equipment pertains to two of four rigs that are being mechanized, automated, refurbished, and rebuilt under the contract that ATI won back in June 2014.